Patented method - List of Manufacturers, Suppliers, Companies and Products

Patented method Product List

1~3 item / All 3 items

Displayed results

Patent construction method "No Scaffolding Anchor Method"

No need for temporary scaffolding! Introducing a patented construction method that achieves stable installation in narrow and high locations!

The "No Scaffolding Anchor Method" is a patented construction method that enables high-quality double pipe installation not only under normal conditions but also in challenging environments such as high altitudes, narrow spaces, and isolated areas. The wire rope device allows for the installation and movement of the drilling machine without the need for temporary scaffolding. It is lightweight and modular, making it suitable for various installation locations. Additionally, if there are no trees available for use, simple supports can be used as substitutes, allowing construction to take place without selecting specific sites or cutting down trees, thereby preserving the natural environment. 【Features】 ■ Registered with the Ministry of Land, Infrastructure, Transport and Tourism NETIS CG-090003-A ■ No need for temporary scaffolding due to the movable wire system ■ Drilling performance with a diameter of 90-115 mm and a length of 20 m ■ Compatible with all drilling methods, including hydraulic double pipe drilling ■ Construction between trees without cutting them down *For more details, please refer to the catalog or feel free to contact us.

  • Special Construction Method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Patent construction method "DL (Direct Line) Method"

A revolutionary construction method that allows finishing work to be done immediately after construction, enabling a reduction in construction time! Partial repairs are also possible.

The "DL (Direct Line) method" is a patented construction method that, being a dry method, prevents mold growth after installation and shortens construction time. As a modified follow-up method, it alleviates displacement and gaps caused by vibrations, and its adjustable installation makes it easy to use without the need for specialized tools. It is compatible with the interlocking method of ALC panels. 【Features】 ■ A groundbreaking method that allows for partial repairs ■ Compliant with VOC measures, containing no specific chemical substances ■ Enables immediate finishing work after installation, allowing for reduced construction time ■ Allows for partial repairs, such as substrate repairs during renovations *For more details, please refer to the related links or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration